For boutique GCs, designers and owners

High-End Commercial Finishes for Boutique GCs, Designers and Owners

Apex Drywall Repair finishes commercial spaces for boutique general contractors, designers and owners who want a high-end result even for a single room: a lobby, a ballroom, tenant finish, a restaurant or an office. Level 5 goes into the bid and the written scope from the start, mock-ups get approved before the finish goes on, and feature walls can carry hand-trowel or other custom texture. Text us plans or photos, along with the year the building was built, and we'll talk through how the job fits your timeline.

What you can count on

  • Finish level in writing. Level 5, texture and sheen spelled out in the scope, so the finish matches the drawings.
  • Mock-ups first. A sample board or test area approved before the full space.
  • Around your schedule. Phased or after-hours work around open businesses and the other trades.
  • One dependable contact. One number to text or call, from walkthrough to final review.
  • Paperwork on request. Certificate of insurance and W-9, made out the way your office needs.

How it works

  1. 1

    Tell us about your properties

    Use the business quote form or call.

  2. 2

    Get firm prices

    Free, from photos, with multi-unit pricing when we can do several units in one trip.

  3. 3

    Send work orders

    By text or email, with photos. We schedule, repair and invoice.

Boutique GCs, designers and owners

This page is for boutique general contractors, designers and building owners who want a high-end finish even when the job is a single space: a hotel or office lobby, a ballroom, a tenant build-out, a restaurant, or one office suite inside a larger building. The common thread isn't the square footage — it's wanting the finish itself done right, written into the bid the same way the flooring or the lighting package is.

We take that work the same way we'd take on a whole custom home: the finish level goes into the scope by name, the texture gets approved before it's applied to a real wall, and the paperwork a commercial job needs is ready before we start. When the job is standard knockdown or orange peel across new drywall or a whole floor of rooms, rather than a feature finish, see drywall texturing.

Level 5 in the bid, mock-ups before the finish

A Level 5 smooth finish gets written into the bid and the scope as its own line, not folded into a vague finish note that leaves the actual standard open to argument once the walls are up. That written line names the areas getting Level 5, so everyone on the job — the GC, the painter, the owner — is working from the same expectation under the same lighting plan.

Before a feature wall gets its hand-trowel or other custom texture, we build a mock-up section and get it approved by whoever's signing off: the designer, the GC, or the owner directly. Hand-trowel texture and Level 5 smooth finish cover both finishes in more depth.

Working around a business that's still open

Tenant finish and restaurant work often has to happen around a space that's already operating, or about to open on a fixed date. We can phase the work by section, or shift to after-hours and off-peak windows, so the rest of the space stays usable while we're on one wall or one room. Tell us the hours the space needs to stay open or closed, and that goes into the scope alongside the finish.

Floors, fixtures and anything nearby get covered before work starts, and each phase gets cleaned up on its own rather than waiting for the whole job to finish. A certificate of insurance and a W-9 go out to the general contractor's or owner's office whenever the paperwork needs them on file, ahead of the first day on site.

Restaurants: where texture works, and where it doesn't

Colorado's food rules put kitchens, dishwashing areas, storage and restrooms under a smooth, cleanable-surface standard, which rules out most decorative texture in those rooms. Dining rooms and bars limited to serving drinks and reheating prepared food are a different story: those areas can usually carry a hand-trowel finish, a Santa Fe texture or another decorative look. An open kitchen or a cooking line in view of guests can fall under the stricter standard, so the exact line gets confirmed with your county health department before it goes into the bid.

Food-code enforcement runs through each county's own health department rather than one statewide office, so we confirm the current rule with yours as part of putting the bid together, before any feature wall goes into the scope.

Older buildings and the asbestos step

A commercial building raised before 1980 falls outside what we take on, since that construction era commonly used asbestos-containing materials in texture and joint compound. For buildings from 1980 on, disturbing existing texture can still call for an asbestos inspection first, depending on the building and how much material the job disturbs. That inspection, when it applies, looks at the material itself before any sanding, scraping or skim-coating begins — we confirm whether it applies to your project before the job goes on the calendar, not after.

Share the year the building was built along with your plans or photos, and we'll talk through the scope and the price before anything is scheduled.

Start with a business quote

Tell us about your properties on the business quote form, or call 720-250-8525.

Questions from GCs and designers

Do you take small commercial jobs, like a single lobby or tenant space?

Yes — a single lobby, tenant space or restaurant gets the same written scope and mock-up approval as a larger job; size matters less than wanting the finish done right.

Can you write Level 5 into our bid documents?

Yes. The finish level goes into the written scope by name, naming the areas getting Level 5, so the GC, the painter and the owner are working from the same standard.

Can you work after hours or phase the job around an open business?

Yes. We can shift to after-hours or off-peak windows, or phase the work by section, so the rest of the space stays open while we're on one area.

Can we use decorative texture in a restaurant?

In dining rooms and bars limited to drinks and reheating prepared food, usually yes. Kitchens, dishwashing areas, storage and restrooms fall under a smooth, cleanable-surface standard that rules most decorative texture out, so we confirm the current rule with your county health department before it goes into the bid.

Does an older building need an asbestos inspection before you start?

It can. We confirm whether an inspection applies to your building and your scope of work before anything is scheduled; buildings raised before 1980 are outside what we take on at all.